Last time my main room will ever look like this.
Oh boy guys. Might have bit off more than I can chew.
I’m like a squatter with a mortgage again, back on an air mattress.
Usually I’m hyper-prepared, but not this project, and am not handling it great. My neighbours saw it in my frantic eyes Saturday, and like how I always say they’re the best, 5 showed up early yesterday morning to help me transfer all my belongs to a trailer.
Minimalist forever.
What is happening?
When I bought the house last July, only thing I put off was the electrical work, it was too huge an undertaking in both cost and time.
Then, living through the winter I realized more fresh air is needed in the main room, and remember, that was the first time I bought something on credit: windows.
So I combined the jobs into Mega Renovation, added more (washing machine repair, plumber) plus “paint the interior of house” because let’s do this project properly.
So if I’m going to have 8 trades coming through and drywall dust everywhere, no way am I leaving my belongings to soak it up. Plus it creates a pleasant work environment for everyone.
Above – the 30-point electrical to-do list
Below – in the trailer while it’s being backed up, playing “Catch my Stuff”
Add the stress that I put everything into a trailer like here, take my life with a tow hook.
So locked it, then parked This Week’s Car in front – 2015 Jaguar XJL.
Added a heater inside.
Here we go!
“Operation Last Renovation of My Life I’m Never Doing this Again and will be Removed from this House in a Box” kicked off at 8am today.
Sorry in advance if it’s a light blog week, and please send good luck!